Tuesday, July 27, 2010
Day 11 - No Slab
I went to the block today with the expectations that the Slab would have commenced with the nice weather we are having, but no. A good thing though was our sign was up at the front of our block. If you look closely at the sign it reads owner P.Maple only (poor Mel I can evict her anytime I want). I measured the distance between the metre box and the fence and the gap is 4 metre's.

Sunday, July 25, 2010
Day 7 - After work inspection
After I spoke with Jarrod (our Metricon site supervisor, his official title) I had to go and see what had happened during the day, so we were going to meet after work, As you can see our Meter box is on site in position on the left hand side of the house, It dosen't look like much room down that side of the house but it is around 3.5-4.0 metres to the fence and then opens up to a huge backyard area straight off the back of the house. The framed house behind is also a Metricon house being built and they are cracking on that build, you can see in the photo pipes coming out of the ground with orange paint on them, that is where the boundary of our water pipes run for storm and sewer. The toilet was also delivered and Mel and I are putting on bets when we take the boys to the block who says that they need to go to the Toilet First, It is a lose lose bet because we both say it will be Bayley! do you agree?

Day 7 - Plumbing in.
You may be thinking 2 taps? why? purple? Well the answer is recycled water! we have access to recycled water from Melton for our garden and lawns, the purple tap is the one to use when doing the Gardens. Like all things you would like these things off to the side however they were put right in the middle. All our underground work was completed on Friday and Jarrod told that the slab would be going down next week and that the framer was booked for the following week.

Thursday, July 22, 2010
Day 6 - Resisted the Temptation
The week has passed and there has been some sunny days at the start of the week but today and Tomorrow they have fore casted rain. I have resisted the temptation this week to go and inspect any works done. Jarrod our builder told us last week that we were only getting our temp fences, portable toilet and maybe the plumbers might get in to do some pipe work. Mel is heading down there Friday to check out what is going on as well as taking Sandi down to show her where the block is and what is around Eynesbury.
Saturday, July 17, 2010
Day 1 - Site Scrape (more photo's)
Friday, July 16, 2010
Day 1 - Site Scrape
Our block is on the right of this path, they have put down some base material before they finish off the concrete footpath, the sun was out today a little chilly but I can imagine this scene in spring or early summer with the sun breaking through the trees, what a thought!

Today was the first day of our build, how exciting, I went and sat in my car and watched the 2 guys starting the site scrape, as you can see in the photo I did get out of my car and take some photo's around the block and I did have a chat to one of the blokes working (I think he thought I was someone who worked for Metricon, so I just played along), he mentioned that they would be done today, I had a call from Jarrod our builder and he mentioned that they had been there and completed the scrape (I didn't tell him that I went there and watched what they were doing, especially on the first day - stalker) and that the toilet and bin would be dropped off next week and also that the plumber would be in to do the pipe work. It is all happening and if it goes to schedule it should finish around Xmas eve, we might do lunch if that is the case! 

Saturday, July 10, 2010
Build Date
Well the time is finally here! we have been given a start date for our house, 16-07-2010. Just over 1 year ago we purchased our block and started the process of getting our new house built. So now it is time to drop in after work or before with the camera and start the Album.