Light at the End of the tunnel

A view from the right front side of our house, the cladding has been completed, the painters come in next week and they spend 4-5 days inside and then they come out and paint the cladding which should take a couple of days. We went to the house today after they completed a site clean up, all the broken roof tiles, bricks etc were all cleaned up. We gathered all the brick that we wanted to keep and put them onto a pallet. The date for completion may be around the start to mid November fingers crossed.A view from the left side of the house, our front veranda with our front door set back in the middle, we still have a green film covering the windows for protection. This photo is at the back of house, Brick work and cladding has been completed. Our garage door has even been fitted. I met Jared our builder at the house and i was able to go inside and take some snaps, I think it has been 3 weeks since we were inside and you can definitely see the changes, I am looking through a wall cavity that we will get a plantation shutter put in, this will be the separation between the rumpus and family room. looking out our french doors into the back yard, having now the big block and seeing the house in position, we can now see the boys playing in the back yard with no restrictions for space, cricket and footy shouldn't be an issue. I took a photo in this same location when the frame went up and you could see across to the golf course, the view is the same you can just look at it in any weather now that we are closed in. Th e view from the kitchen bench looking across to the family room, plenty of light. Plenty of light was coming through the windows on the left hand side of the house, the afternoon sun will come through this way. Our Ensuite has double basin's in the square design, we have laminate tops in the ensuite , bathroom and Laundry. This is our Kitchen , The up top cupboards are a chocolate color with the pot drawers below are a cream color, the gap between the up top cupboards is for the range hood and below for the stove. The middle section is to be tiled. Our island bench has our double sink cut in, our kitchen bench tops are Ceaser stone that hasn't been delivered as yet. Our base cupboards are a light color with the chocolate brown being the back surround. Our Laundry Trough is in place, all our cabinetry has been matched together to keep the same look throughout the house. Our Master Bedroom doors, our walk in robe to the left of the photo.












2 comments:

  1. Looking good. Hope they left some sand for Bayley!

    ReplyDelete
  2. I think you mean overhead cupboards...up top cupboards...LOL You dont spend enough time in the kitchen if you dont know what the cupboards are called :) Mel

    ReplyDelete