Sunday, July 25, 2010
Day 7 - After work inspection
After I spoke with Jarrod (our Metricon site supervisor, his official title) I had to go and see what had happened during the day, so we were going to meet after work, As you can see our Meter box is on site in position on the left hand side of the house, It dosen't look like much room down that side of the house but it is around 3.5-4.0 metres to the fence and then opens up to a huge backyard area straight off the back of the house. The framed house behind is also a Metricon house being built and they are cracking on that build, you can see in the photo pipes coming out of the ground with orange paint on them, that is where the boundary of our water pipes run for storm and sewer. The toilet was also delivered and Mel and I are putting on bets when we take the boys to the block who says that they need to go to the Toilet First, It is a lose lose bet because we both say it will be Bayley! do you agree?

Subscribe to:
Post Comments (Atom)
Definately Bayley. Rylie would say "Ew, I'm not using that"
ReplyDelete